• 0

Project Consultancy, Reports & Profiles

Telangana is a state in the Southern region of India. It has an area of 114,840 km2 and is the twelfth largest state in India. Most of it was part of the princely state of Hyderabad, ruled by the Nizam of Hyderabad during the British Raj, joining the Union of India in 1948. Telangana was separated from Andhra Pradesh as a new 29th state of India, with the city of Hyderabad as its capital. Hyderabad will continue to serve as the joint capital city for Andhra Pradesh and Telangana for a period of not more than ten years. Telangana is situated on the Deccan Plateau, in the central stretch of the eastern seaboard of the Indian Peninsula. It covers 114,800 square kilometers (44,300 sq. mi). The region is drained by two major rivers, with about 79% of the Godavari River catchment area and about 69% of the Krishna River catchment area, but most of the land is arid. Telangana region has rich natural resources. About 45 per cent of the forest area in Andhra Pradesh state is in Telangana region while 20 per cent of the country's coal deposits in the country are also found here. Telangana is also rich in limestone deposits that cater to cement factories. Telangana has other mineral resources like bauxite and mica. Perennial rivers Godavari and Krishna enter Andhra Pradesh in Telangana before flowing down through other regions and ending up in the Bay of Bengal. Telangana region is sitting on potential oil and natural gas reserves, according to a report by Director General of Hydrocarbons (DGH). Telangana has a significant amount of Software export in India. While majority of the Industry is concentrated over Hyderabad, the other cities are also becoming significant IT destinations in the state. Hyderabad's IT exports exceeded $7 billion in 2014.There have been extensive investments in digital infrastructure.

 

AGRICULTURE

Rice is the major food crop and staple food of the state. Other important crops are tobacco, mango, cotton and sugar cane. Agriculture has been the chief source of income for the state's economy. Important rivers of India are the Godavari, Krishna flow through the state, providing irrigation. Telangana agriculture department separated from Andhra Pradesh as part of Andhra Pradesh bifurcation It aims promote agricultural trade and to boost up the agricultural production and productivity in the Telangana.

 

TOURISM IN TELANGANA

Telangana State Tourism Development Corporation (TSTDC) is a state government agency which promotes Tourism in Telangana. Telangana has a variety of tourist attractions including historical places, monuments, forts, water falls, forests and temples. Charminar, Golconda Fort, QutbShahi Tombs, Chowmahalla Palace, Falaknuma Palace and Bhongir Fort, are some of the monuments in the state. The Charminar, built in 1591 CE, is a monument and mosque located in Hyderabad, Telangana, India.

 

DEMOGRAPHIC PROFILE

Telangana with a population of 351.9 lakhs (according to the 2011 census) accounts for about 3.6% percent of the total population of India. Out of this, 177.0 lakhs (50.2%) are males and 174.9 lakhs (49.8%) are females. The sex ratio of the state is 988 as against the national figure of 943. The population density in the state is 307 persons/Sq.Km. In 2012-13, the services sector at Rs.  1, 14,046 crores, contributed 58.1% to the GSDP (at constant prices). It is followed by industry sector, contributing 27.9% (Rs. 54,687 crores) and the agriculture sector’s contribution of 14% (Rs. 27,450 crores). The services sector had fastest growth  of  11.31%  followed  by  industry  sector  (10.04%)  and  agriculture  sector  (6.89%) between 2004-05 and 2012-13.

The Telangana government has proposed to add 230 crore plants in the next three years under a flagship programme which envisages boosting of tree cover in the state by nearly 8%.

 

FOOD AND INDUSTRIAL PROCESSING SECTOR

The Telangana government plans to put greater emphasis on value-addition in the farm sector in its industrial policy. The departments of industry and commerce, agriculture and agro marketing would coordinate together to achieve value maximization for farmers. The government is also keen on encouraging e-marketing activities, which involves networking all agriculture mandis in the state so that farmers get access to prevailing prices across important markets and thereby helping them unlock the right value for their produce. The state in collaboration with research institutes in the country would facilitate an ideal adoption of latest practices ranging from seed technology and farm machinery to improve farm productivity. the state government is also considering specific projects such as setting up a pharmaceutical city near Hyderabad and a cotton hub in Warangal district, the largest producer of long-staple cotton. The Telangana government has begun a survey to identify land that can be offered to new industries in the state. The Telangana government is set to announce its new industrial policy under which scheduled castes and scheduled tribe entrepreneurs would be specially encouraged.

Telangana Government is mulling to set up a 'Pharma City' near the state capital in about 8,000 acres. The City will include industries as well as residential colony, and a power plant with 500 MW capacity will be set up adjacent to the pharma city to provide captive, dedicated and uninterrupted power supply to the industry. The pharma city is expected to accommodate about five lakh employees besides their families in the residential colony touching about twenty lakh over a period. Delegation of Drugs Manufacturers' Association that an international consultancy organisation with expertise in developing in the information technology and pharmaceuticals manufacturing sectors may become backbone of Telangana economy, leaving power production, ports and oil and natural gas to play a pivotal role in driving prosperity in the residuary state. Industrial estates should be contacted to design the pharma city. Telangana's per capita income of Rs 24,409 in 2004-05 has phenomenally grown to a whopping Rs 83,020. While Hyderabad has less number of households using open toilets at 0.9 per cent, Mahabubnagar is at 71.1 per cent. The land-locked state is expected to have nearly Rs 4,000 crore surplus budget, but lingering power deficit may force the new government to spend more on the power purchase. Telangana, spread in 1,14,840 square kilometres, has 66.46 per cent literacy rate with a population of 3.52 crore.

 

ECONOMY OF TELAGANA

The Economy of Telangana is mainly driven by agriculture. Two important rivers of India, the Godavari and Krishna, flow through the state, providing irrigation. Rice, cotton, mango and tobacco are the local crops. Recently, crops used for vegetable oil production such as sunflower and peanuts have gained favour. There are many multi-state irrigation projects in development, including Godavari River Basin Irrigation Projects and NagarjunaSagar Dam, the world's highest masonry dam. Telangana is a mineral-rich state, with coal reserves at SingaerniColleries. The population of Telangana is over 35 million now – much more than 30 million for the whole of Andhra Pradesh, including Telangana, at the time of its formation in 1956. The demands on governance have multiplied over this half a century. Apart from commitment to the development of the region, a smaller state being more easily accessible to the common people can intelligently and speedily grapple with their problems.

 

INDUSTRIAL POLICY FRAMEWORK FOR STATE OF TELANGANA

Industrialization will be the key strategy followed for economic growth and development for Telangana, the 29th state of the country. People of the new state have very high expectations from the Telangana State Government for creating jobs for the youth, promote development of backward areas, maximize growth opportunities by optimum utilization of the available resources, harness the talents and skills of the people etc. The Government of Telangana State realizes that industrial development requires large-scale private sector participation, with the government playing the role of a facilitator and a catalyst. The government is committed to provide a graft-free, hassle-free environment in which the entrepreneurial spirit of local, domestic and international investors will thrive to take up their industrial units in the state of Telangana as the preferred investment destination.

The new Telangana State Industrial Policy will be rooted in certain core values, as follows:

 

                • The Government regulatory framework shall facilitate industrial growth

                • Entrepreneurs will thrive in a peaceful, secure and progressive business regulatory                                        environment

                • Industrial development will lead to massive creation of jobs benefitting local youth

                • Industrialization shall be inclusive and facilitate social equality

 

The new Telangana State Industrial Policy will strive to provide a framework which will not only stabilize and make existing industries more competitive, but also attract and realize new international and national investments in the industrial sector. It is expected that the most significant outcome of this approach will be the production of high quality goods at the most competitive price, which establishes “Made in Telangana-Made in India” as a brand with high global recognition. The Industrial Policy Framework has the following mandate for departments that have any responsibility in the industrialization of the State—Minimum Inspection and Maximum Facilitation.

The Government of Telangana State is determined to create an ecosystem in which the ease of doing business in the state matches and even exceeds the best global standards. Telangana State Government is aware that offering a hassle-free system is considered to be of the highest priority by the industrialists, and accordingly the government will implement a very effective industrial clearance system that will go beyond the traditional single window system.

 

THRUST AREAS AND CORE SECTORS

•             Life Sciences including, bulk drugs, formulations, vaccines, nutraceuticals, biological,   incubation centers, R&D facilities and medical equipment.

•             IT Hardware including bio-medical devices, electronics, cellular communications.

•             Precision engineering, including aviation, aerospace, defence.

•             Food processing and nutrition products including dairy, poultry, meat and fisheries.

•             Automobiles, Transport Vehicles, Auto-components, Tractors and Farm Equipment.

•             Textiles and Apparel, Leather and leather value added products like shoes, purses, bags,         artificial   material infused and coated textiles, paper and paper products.

•             Plastics and Polymers, Chemicals and Petro-chemical, glass and ceramics.

•             FMCG and Domestic Appliances.

•             Engineering and Capital Goods, including castings, foundry and Ferro-alloys and other    metallurgical industries.

•             Waste Management and Green Technologies.

•             Renewable Energy and Solar Parks.

•             Mineral-based and wood-based Industries.

•             Transportation/Logistic Hub/Inland Port/Container Depot.

 

Telangana has emerged as a State that provides that right climate for the growth of IT business and is now one of the most preferred destinations in the Country.

The State of Telangana is poised towards creating a benchmark in Information & Communication Technology (ICT) endowed with a high quality state-of-the-art physical & communication infrastructure of international standards, harnessed human resources, and proactive business friendly policies of the Government.

It is estimated that about 20 lakh acres of land is available in the state that has been identified as unfit for cultivation in Telangana. Based on a detailed survey of these land parcels and identification of those parcels that are fit for industrial use, an industrial land bank for the State of Telangana will be developed.

The development of industrial and related infrastructure will be the responsibility of the Telangana State Industrial Infrastructure Corporation (TSIIC). The financial base of the TSIIC will be strengthened and it will be made to function as an effective organization. All lands in the State identified as fit for industrial use will be transferred to the TSIIC.

To support industrialization, the Government of Telangana will earmark 10% of water from all existing and new irrigation sources for industrial use. Water pipelines will be laid as a part of infrastructure creation for each industrial park by TSIIC. The Government of Telangana State recognizes that quality power and uninterrupted power supply are keys to the growth of the industrial sector. The State has a clear short-, medium-, and long-term plans to first overcome the power shortage and eventually become a power surplus state. Accordingly, uninterrupted power supply will be arranged in each industrial park. The Telangana State Government will encourage usage of non-conventional energy for industrial purposes.

The Telangana State Government is committed to encourage the process of industrialization by making various kinds of incentives available to the entrepreneurs. The Telangana State Government also assures an entrepreneur-friendly and graft-free regime of disbursing the incentives. The Telangana State Government will consider providing incentives to the entrepreneurs in the following areas-

•             Stamp duty reimbursement

•             Land conversion cost

•             Investment subsidy

•             VAT reimbursement

•             Interest subsidy

•             Clean production measures

•             Reimbursement of infrastructure development costs etc.

A sound industrial policy has to ensure that the state taxation structure is conducive to industrial growth and state financial resource augmentation. Distortions in the tax structure leads to evasion of taxes and clandestine transport of industrial inputs and outputs to neighbouring states, which may have advantageous tax rates. The presence of important national and state highways, coupled with the availability of resources and opportunities, provides a great potential for development of industrial corridors in the state along these roadways.

The Industrial Corridors that will be developed initially will be:

 

1) Hyderabad-Warangal Industrial Corridor

2) Hyderabad-Nagpur Industrial Corridor

3) Hyderabad-Bengaluru Industrial Corridor

The new Industrial Policy brought out by the Government of Telangana promises to revolutionise the way industrial sector has been viewed by successive governments in this country. A day is not far when the new Industrial Policy of Telangana will shine as an exemplar among the best in the world.


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Mosquito Repellent Liquidator
Mosquito Repellent Liquidator

The mosquito repellent consists of a liquid mix that gets converted into vapors on moderate heating. Thes... Read More

Capacity :
Mosquito Repellent Liquidator, Vaporiser 50 ml size PET Bottle: 2,400,000 Nos/annum
Plant and Machinery cost:
18.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
39.00 %
TCI :
0.00 Lakhs
Cost of Project :
291.00Lakhs
Add To Inquiry Basket
Production of PE Wax Emulsion (Polyethylene Wax Emulsion)
Production of PE Wax Emulsion (Polyethylene Wax Emulsion)

Production of PE Wax Emulsion (Polyethylene Wax Emulsion) ... Read More

Capacity :
20 MT/Day
Plant and Machinery cost:
97.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
343.00Lakhs
Add To Inquiry Basket
PUFFED RICE (Muri)
PUFFED RICE (Muri)

Puffed Rice is a commonly consumed commodity as a pastime snack. It can be used in combination with nuts such as groundnut ... Read More

Capacity :
1200 MT/annum
Plant and Machinery cost:
6.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
74.00 %
TCI :
0.00 Lakhs
Cost of Project :
28.00Lakhs
Add To Inquiry Basket
Kraft Paper From Waste Paper
Kraft Paper From Waste Paper

Kraft paper is paper produced from chemical pulp produced in the kraft process. Sack kraft paper, or just sack paper, is... Read More

Capacity :
7500 MT/annum
Plant and Machinery cost:
914.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
1756.00Lakhs
Add To Inquiry Basket
Multiblade Safety Razor
Multiblade Safety Razor

A safety razor is a shaving implement with a protective device positioned between the edge of the blade and the skin. The i... Read More

Capacity :
Multiblade Safety Razor (2 Blade): 86,400,000 Nos/annum
Plant and Machinery cost:
313.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
826.00Lakhs
Add To Inquiry Basket
Spices in Pouch Packing
Spices in Pouch Packing

Spices are non-leafy parts (e.g. bud, fruit, seed, bark, rhizome, and bulb) of plants used as a flavoring or seasoning, alt... Read More

Capacity :
360,000 kgs./annum
Plant and Machinery cost:
26.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
44.00 %
TCI :
0.00 Lakhs
Cost of Project :
181.00Lakhs
Add To Inquiry Basket
Tennis Ball  (Used in Playing Cricket)
Tennis Ball (Used in Playing Cricket)

Tennis ball cricket is a variant of cricket popular in the Indian subcontinent, and a very South Asians living in the US &a... Read More

Capacity :
1,500,000 NOS/annum
Plant and Machinery cost:
39.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
164.00Lakhs
Add To Inquiry Basket
NPK Complex Organic Fertilizer Plant
NPK Complex Organic Fertilizer Plant

Feeding a population of 9 billion pe... Read More

Capacity :
3600 MT/annum
Plant and Machinery cost:
177.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
50.00 %
TCI :
498.00 Lakhs
Cost of Project :
498.00Lakhs
Add To Inquiry Basket
Adhesive Based on Epoxy Resin (2 Pack)
Adhesive Based on Epoxy Resin (2 Pack)

The adhesive industry has seen signi... Read More

Capacity :
Pure Epoxy Resin with Curing Agent : 9000000 Kgs/Annum
Plant and Machinery cost:
162.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
60.00 %
TCI :
698.00 Lakhs
Cost of Project :
698.00Lakhs
Add To Inquiry Basket
E-Waste Recycling Plant
E-Waste Recycling Plant

Electronic wastes, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE) is a description of surplus, obsolete, broken or discarded... Read More

Capacity :
Copper Wire: 500mt/annum Plastic Granules: 2230mt/annum Glass: 970mt/annum Ferrous Metal: 800mt/annu
Plant and Machinery cost:
132.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
51800000.00Lakhs
Add To Inquiry Basket
Pan Masala
Pan Masala

The custom of chewing breath fresheners after meals has a very long history, particularly in India. Pan Masala is a balanced mixture of betel leaf ... Read More

Capacity :
Sada Pan Masala: 99000kgs/annum Meetha Pan Masala: 99000kgs/annum Zarda Pan Masala: 102000kgs/annum
Plant and Machinery cost:
35.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
226.00Lakhs
Add To Inquiry Basket
Aluminium Fluoride
Aluminium Fluoride

Aluminium fluoride is the chemical compound with the formula AlF3. It has the consistency of a white powder. AlF... Read More

Capacity :
Aluminium Fluoride : 60,000MT/annum Silica as bye product : 20,400MT/annum
Plant and Machinery cost:
1739.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
3496.00Lakhs
Add To Inquiry Basket
Floral Foam
Floral Foam

Floral foam is a dense, lightweight and porous material that can be cut into virtually any shape. It holds its shape when w... Read More

Capacity :
3,600,000 Pcs/annum
Plant and Machinery cost:
69.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
270.00Lakhs
Add To Inquiry Basket
Wire Nail
Wire Nail

Wire nail is very well known item, as it is very common product, which is normally used in daily life. It is used for fa... Read More

Capacity :
Wire Nail : 369,600 Kgs/annum Wire Scrap : 34,800 Kgs/annum
Plant and Machinery cost:
11.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
59.00Lakhs
Add To Inquiry Basket
Particle Board (Wood Base)
Particle Board (Wood Base)

Particle Boards are a relatively new type of engineered wood product.It is cheaper, denser and more uniform than conventional wood and plywood. The... Read More

Capacity :
600Nos/day
Plant and Machinery cost:
452.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
54.00 %
TCI :
1066.00 Lakhs
Cost of Project :
1066.00Lakhs
Add To Inquiry Basket
Calcium Silicate Blocks and Pipes
Calcium Silicate Blocks and Pipes

Calcium silicate is the chemical comp... Read More

Capacity :
Calcium Silicate Blocks : 31250 sq.mt./MT/annum Calcium Silicate Pipes: 750 sq.mt./MT/annum
Plant and Machinery cost:
62.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
66.00 %
TCI :
158.00 Lakhs
Cost of Project :
158.00Lakhs
Add To Inquiry Basket
Glass Sheet
Glass Sheet

It is difficult to conceive the cont... Read More

Capacity :
Glass Sheet: 1000500 Sq.Mt/annum
Plant and Machinery cost:
919.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
14.00%
Break Even Point (BEP):
60.00 %
TCI :
1742.00 Lakhs
Cost of Project :
1742.00Lakhs
Add To Inquiry Basket
Baby & Adult Diaper & Sanitary Pads
Baby & Adult Diaper & Sanitary Pads

A diaper or nappy is a kind of under... Read More

Capacity :
Baby Diapers : 3000000 Pkts/annum Adult Diapers : 1500000 Pkts/annum Sanitary Napkins : 4500000 Pkts
Plant and Machinery cost:
1029.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
51.00 %
TCI :
1657.00 Lakhs
Cost of Project :
1657.00Lakhs
Add To Inquiry Basket
Aluminium Foil
Aluminium Foil

Aluminium plays a major role in the m... Read More

Capacity :
Household, Food Packaging: 3,000 MT/Annum Grade Aluminium Foil Pharmaceutical Grade Printed : 1,500
Plant and Machinery cost:
1340.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
60.00 %
TCI :
2717.00 Lakhs
Cost of Project :
2717.00Lakhs
Add To Inquiry Basket
Dal Mill (Pulses)
Dal Mill (Pulses)

India is the ... Read More

Capacity :
Pigeon peas: 12,000 MT/Annum Green Gram : 12,000 MT/Annum Chickpeas: 12,000 MT/Annum
Plant and Machinery cost:
1908.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
53.00 %
TCI :
3128.00 Lakhs
Cost of Project :
3128.00Lakhs
Add To Inquiry Basket
Industrial Training Institute
Industrial Training Institute

Industrial Training Institute (I.T.I)

Read More

Capacity :
Total number of students: 3600 students/annum (each trade 120 students) 16 Trade 1 year duration 14
Plant and Machinery cost:
314.25 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
45.00 %
TCI :
2476.00 Lakhs
Cost of Project :
2476.00Lakhs
Add To Inquiry Basket
Residential School
Residential School

The importance of education was well... Read More

Capacity :
5000 Nos of students
Plant and Machinery cost:
642.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.35%
Break Even Point (BEP):
0.00 %
TCI :
4887.00 Lakhs
Cost of Project :
4887.00Lakhs
Add To Inquiry Basket
Municipal Solid Waste Management
Municipal Solid Waste Management

Due to rapid increase in the production and consumption processes, societies generate as well as reject solid materials regularly from various sect... Read More

Capacity :
Organic Compost :165 MT/Day•Refused Derived Fuel (RDF):36 MT/Day •Plastics :12 MT/Day •Inerts:
Plant and Machinery cost:
770.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.77%
Break Even Point (BEP):
56.45 %
TCI :
1035.00 Lakhs
Cost of Project :
1035.00Lakhs
Add To Inquiry Basket
Dall Mill (Pulses)
Dall Mill (Pulses)

The various pulses are part of the no... Read More

Capacity :
Yellow Peas Dall :4MT /Day,Chana Dall :3MT /Day •Lentil Dall :3MT /Day
Plant and Machinery cost:
70.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.45%
Break Even Point (BEP):
60.27 %
TCI :
235.00 Lakhs
Cost of Project :
235.00Lakhs
Add To Inquiry Basket
Vanilla Farming
Vanilla Farming

Vanilla is a tropical orchid, cultivated for its pleasant flavour, which is one of the costliest spices in the international market. Though more th... Read More

Capacity :
Vanilla Beans:12 Kgs/Day
Plant and Machinery cost:
19.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.59%
Break Even Point (BEP):
56.42 %
TCI :
47.00 Lakhs
Cost of Project :
47.00Lakhs
Add To Inquiry Basket
Dairy Farming & Dairy Products (Pasteurised Milk & Curd)
Dairy Farming & Dairy Products (Pasteurised Milk & Curd)

In India dairying has been practiced... Read More

Capacity :
Cows: 250 Nos Pasturised Milk (1 Ltr & 500 ml Packs):6000 Ltrs/Day •Curd (250 ml Cups & Pouch
Plant and Machinery cost:
277.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.72%
Break Even Point (BEP):
47.38 %
TCI :
605.00 Lakhs
Cost of Project :
605.00Lakhs
Add To Inquiry Basket
Multiplex Cinema Hall (108+108 Seats Double Screen)
Multiplex Cinema Hall (108+108 Seats Double Screen)

A Multiplex is a multi screen entertainment complex showing different films under one roof with other type of supporting business in the vicinity l... Read More

Capacity :
108 Seats Double Screen
Plant and Machinery cost:
157.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
21.24%
Break Even Point (BEP):
57.13 %
TCI :
470.00 Lakhs
Cost of Project :
470.00Lakhs
Add To Inquiry Basket
Pulp and Paper from Bamboo
Pulp and Paper from Bamboo

Paper is a major product of the forestry industry, and is used widely in our society. Paper products are used not only in their obvious application... Read More

Capacity :
100MT/Day
Plant and Machinery cost:
5457.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.62%
Break Even Point (BEP):
54.00 %
TCI :
8300.00 Lakhs
Cost of Project :
8300.00Lakhs
Add To Inquiry Basket
Wheat Flour
Wheat Flour

Wheat is grown in most parts of the world, from near-arctic to near-equatorial latitudes. It is the most important crop among the cereals by area p... Read More

Capacity :
150 MT/Day
Plant and Machinery cost:
385.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
58.00 %
TCI :
904.00 Lakhs
Cost of Project :
904.00Lakhs
Add To Inquiry Basket
Garlic Oil and Powder
Garlic Oil and Powder

Garlic is one of the important bulb crops grown and used as spice and condiment throughout India. It possesses a high nutritive value and medicinal... Read More

Capacity :
Garlic Oil :10 Kgs/ Day •Garlic Powder:2 MT /Day
Plant and Machinery cost:
58.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
56.00 %
TCI :
241.00 Lakhs
Cost of Project :
241.00Lakhs
Add To Inquiry Basket
Honey Processing
Honey Processing

Honey is a natural product produced by honeybees and consists of a very concentrated solution of a complex mixture of ... Read More

Capacity :
1000 Kgs/ Day
Plant and Machinery cost:
16.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
57.00 %
TCI :
126.00 Lakhs
Cost of Project :
126.00Lakhs
Add To Inquiry Basket
Paint Industry (Decorative Paint & Acrylic Emulsion Paint)
Paint Industry (Decorative Paint & Acrylic Emulsion Paint)

Paint is any liquid, liquefiable, or mastic composition that, after application to a substrate in a thin layer, conver... Read More

Capacity :
Decorative Paint:800 Kgs/Day •Acrylic Emulsion Paint:800 Kgs/Day
Plant and Machinery cost:
96.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
48.00 %
TCI :
303.00 Lakhs
Cost of Project :
303.00Lakhs
Add To Inquiry Basket
4 Star Hotel
4 Star Hotel

India, a country with snow-peaked mo... Read More

Capacity :
55 Rooms, 5 Suits, 2 Banquet Hall & Conference Hall
Plant and Machinery cost:
265.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
40.00 %
TCI :
2634.00 Lakhs
Cost of Project :
2634.00Lakhs
Add To Inquiry Basket
Copper Powder By Electrolytic Process
Copper Powder By Electrolytic Process

Copper makes vital contributions to sustaining and improving society. Copper's chemical, physical and aesthetic propertiesmake it a materialof choi... Read More

Capacity :
Copper Powder : 15,000 MT/Annum
Plant and Machinery cost:
307.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
46.00 %
TCI :
3050.00 Lakhs
Cost of Project :
3050.00Lakhs
Add To Inquiry Basket
Mink Blankets
Mink Blankets

A blanket is a type of bedding, a large piece of woven cloth, intended to keep the user warm, especially while sleeping or lying down. A blanket tr... Read More

Capacity :
Double Bed Blankets (3.50 Kgs Size): 444,900Nos/Annum Single Bed Blankets (2.50 Kgs Size) : 420,000N
Plant and Machinery cost:
1031.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
56.00 %
TCI :
2048.00 Lakhs
Cost of Project :
2048.00Lakhs
Add To Inquiry Basket
Solar Panel Assembling & Solar Power Inverter on Grid, Off Grid WithSolar Pump Controller
Solar Panel Assembling & Solar Power Inverter on Grid, Off Grid WithSolar Pump Controller

A solar cell, sometimes called a photovoltaic cell, is a device that converts light energy into electrical energy.Solar panels generate free power ... Read More

Capacity :
Poly Crystaline Solar PV Modules Cap10 Watt: 1,200,000 Nos/Annum Poly Crystaline Solar PV Module Cap
Plant and Machinery cost:
1225.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
56.00 %
TCI :
1674.00 Lakhs
Cost of Project :
1674.00Lakhs
Add To Inquiry Basket
Pulpy Fruit Drinks  (Fruit Juice with Fruit Pulp)
Pulpy Fruit Drinks (Fruit Juice with Fruit Pulp)

A freshly squeezed orange or fresh pulped and strained apple would supply a fruit juice drink for immediate consumption, but to expect it to mainta... Read More

Capacity :
Mango Juice : 600,000 Ltrs/Annum Orange Juice : 600,000 Ltrs/Annum Pipeapple Juice : 600,000 Ltrs/
Plant and Machinery cost:
83.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
59.00 %
TCI :
809.00 Lakhs
Cost of Project :
809.00Lakhs
Add To Inquiry Basket
Cold Storage for Fruits and Vegetables
Cold Storage for Fruits and Vegetables

India is the largest producer of fru... Read More

Capacity :
12000 Mt/Annum
Plant and Machinery cost:
92.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
55.00 %
TCI :
342.00 Lakhs
Cost of Project :
342.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes
Disposable Plastic Syringes

Disposable Syringes are made of plas... Read More

Capacity :
Disposable Plastic Syringes 2 ml Size : 300,000 Boxes/Annum Disposable Plastic Syringes 5 ml Size
Plant and Machinery cost:
802.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
44.00 %
TCI :
1474.00 Lakhs
Cost of Project :
1474.00Lakhs
Add To Inquiry Basket
Biomedical Waste Recycling
Biomedical Waste Recycling

Biomedical waste is waste that is either putrescible or potentially infectious. Biomedical waste may also include waste associated with the generat... Read More

Capacity :
Plastic Granules 3 MT/Day •Recycled Paper 3 MT/Day •Recycled Glass 1 MT/Day •Recycled Metal 0.50 MT/
Plant and Machinery cost:
214.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.65%
Break Even Point (BEP):
52.47 %
TCI :
1182.00 Lakhs
Cost of Project :
1182.00Lakhs
Add To Inquiry Basket
Benzoic Acid
Benzoic Acid

Benzoic acid C7H6O2 (or C6H5COOH), is a colorless crystalline solid and a simple aromatic carboxylic acid. Today, benzoic acid is produced by oxida... Read More

Capacity :
Benzoic Acid 33.33 MT/Day
Plant and Machinery cost:
1067.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
60.92 %
TCI :
1628.00 Lakhs
Cost of Project :
1628.00Lakhs
Add To Inquiry Basket
Warehouse
Warehouse

We often define warehousing as the storage of goods. Broadly interpreted, this definition includes a wide spectrum of facilities and locations that... Read More

Capacity :
Sacks Storage:50,000 Sacks/Day
Plant and Machinery cost:
181.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
23.72%
Break Even Point (BEP):
40.42 %
TCI :
771.00 Lakhs
Cost of Project :
771.00Lakhs
Add To Inquiry Basket
Fusion Bonded Epoxy Coating of Rebars
Fusion Bonded Epoxy Coating of Rebars

Fusion bonded epoxies are one part, heat curable, thermosetting epoxy utilized for corrosion protection. FBEs are applied to heated parts in a powd... Read More

Capacity :
Fusion Bonded Epoxy Coated Rebars 333 MT/Day
Plant and Machinery cost:
680.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.17%
Break Even Point (BEP):
58.80 %
TCI :
2125.00 Lakhs
Cost of Project :
2125.00Lakhs
Add To Inquiry Basket
Masala Powder
Masala Powder

Spices are non-leafy parts (e.g. bud, fruit, seed, bark, rhizome, bulb) of plants used as a flavoring or seasoning, al... Read More

Capacity :
Red Chilli Powder:400 Kgs/Day •Sambhar Masala :400 Kgs/Day •Biryani Masala:400 Kgs/Day •Chicken F
Plant and Machinery cost:
54.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.23%
Break Even Point (BEP):
50.14 %
TCI :
317.00 Lakhs
Cost of Project :
317.00Lakhs
Add To Inquiry Basket
Biodiesel
Biodiesel

Biodiesel (chemically known as fatty acid methyl ester) is an alternative fuel to conventional diesel (obtaine... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
1.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Maltodextrin
Maltodextrin

Maltodextrin is a mixture of glucose, maltose, oligosaccharides and polysaccharides. Maltodextrin is 15 to 20%... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
1.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Methyl isobutyl Ketone (MIBK)from Acetone
Methyl isobutyl Ketone (MIBK)from Acetone

Methyl isobutyl ketone (MIBK) is a colorless liquid with an odor similar to mothballs. MIBK is also known as 4-methyl-2-pentanone, hexane and isopr... Read More

Capacity :
166 MT/ Day
Plant and Machinery cost:
3216.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
54.00 %
TCI :
5881.00 Lakhs
Cost of Project :
5881.00Lakhs
Add To Inquiry Basket
Readymade Garments (Jean Trousers & Shirts)
Readymade Garments (Jean Trousers & Shirts)

Readymade garments are a part of our daily life. Clothes are an epitome of a culture. People in different parts of the world have their own styles ... Read More

Capacity :
•Shirts :500 Pcs/Day•Jeans Trouser:500 Pcs/Day
Plant and Machinery cost:
50.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.66%
Break Even Point (BEP):
57.61 %
TCI :
247.00 Lakhs
Cost of Project :
247.00Lakhs
Add To Inquiry Basket
Copper Powder by Electrolytic Process
Copper Powder by Electrolytic Process

Copper makes vital contributions to sustaining and improving society. Copper's chemical, physical and aesthetic properties make it a material of ch... Read More

Capacity :
Copper Powder:3.33 MT/Day
Plant and Machinery cost:
46.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.33%
Break Even Point (BEP):
63.22 %
TCI :
321.00 Lakhs
Cost of Project :
321.00Lakhs
Add To Inquiry Basket
Masala Powder
Masala Powder

Spices are non-leafy parts (e.g. bud, fruit, seed, bark, rhizome, bulb) of plants used as a flavoring or seasoning, al... Read More

Capacity :
Red Chilli Powder:400 Kgs/Day •Sambhar Masala :400 Kgs/Day •Biryani Masala:400 Kgs/Day •Chicken F
Plant and Machinery cost:
54.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.29%
Break Even Point (BEP):
56.07 %
TCI :
239.00 Lakhs
Cost of Project :
239.00Lakhs
Add To Inquiry Basket
Bread Plant (Semi–Automatic)
Bread Plant (Semi–Automatic)

Bread is a staple foodstuff, which is made and eaten in most countries around the world. Bread products have evolved to take many forms, each based... Read More

Capacity :
Bread (400 gms):10000 Pkts/Day
Plant and Machinery cost:
52.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
69.00 %
TCI :
101.00 Lakhs
Cost of Project :
101.00Lakhs
Add To Inquiry Basket
SORBITOL
SORBITOL

Sorbitol, a polyol (sugar alcohol), is a bulk sweetener. Sorbitol is produced either from starch hydrolysates, from dextrose syrup, or from dextros... Read More

Capacity :
40.0 Tonnes/Day
Plant and Machinery cost:
31.00 Lakhs
Working Capital :
91.00
Rate of Return (ROR):
56.65%
Break Even Point (BEP):
44.17 %
TCI :
151.00 Lakhs
Cost of Project :
151.00Lakhs
Add To Inquiry Basket
Cattle Feed
Cattle Feed

The principal feed resources for animal consumption in the country are crop residues like straws of wheat, rice and ot... Read More

Capacity :
100 MT/Day
Plant and Machinery cost:
115.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.19%
Break Even Point (BEP):
53.57 %
TCI :
660.00 Lakhs
Cost of Project :
660.00Lakhs
Add To Inquiry Basket
Bicycle Manufacturing
Bicycle Manufacturing

A bicycle, is a human-powered, pedal-driven, single-track vehicle, having two wheels attached to a frame, one behind the other. A bicycle rider is ... Read More

Capacity :
Bicycles (Different Sizes):2000 Nos./Day
Plant and Machinery cost:
270.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.39%
Break Even Point (BEP):
31.24 %
TCI :
3972.00 Lakhs
Cost of Project :
3972.00Lakhs
Add To Inquiry Basket
Apple Chips
Apple Chips

Apple is one of the delicious fruits. It contains vitamins, minerals, enzyme, fruit juices etc. It is very good taste to eat fresh and its juice al... Read More

Capacity :
800 Kgs/Day
Plant and Machinery cost:
336.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
41.00 %
TCI :
533.00 Lakhs
Cost of Project :
533.00Lakhs
Add To Inquiry Basket
PVC Flex Banner (Frontlit, Backlit & Vinyl)
PVC Flex Banner (Frontlit, Backlit & Vinyl)

PVC flex is made out of PVC and fabric raw material, specially designed for solvent printing industry. It is suitable ... Read More

Capacity :
PVC Flex Banner (Frontlit/Backlit) 440 g/m2:20 MT/Day •PVC Flex Banner Vinyl 440 g/m2:5 MT/Day
Plant and Machinery cost:
550.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
50.14 %
TCI :
1196.00 Lakhs
Cost of Project :
1196.00Lakhs
Add To Inquiry Basket
LED Light Assembling
LED Light Assembling

A light emitting diode (LED) is a device which converts electrical energy in to light. LEDs are preferred light sources for short distance (local a... Read More

Capacity :
LED Bulbs (2.5, 5, 7 & 9 Watt Size):400 Nos/Day •LED Tubes (20 Watt Size):40 Nos/Day
Plant and Machinery cost:
8.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
63.00 %
TCI :
65.00 Lakhs
Cost of Project :
65.00Lakhs
Add To Inquiry Basket
Granite Mining (E O U)
Granite Mining (E O U)

Granite is a common type of felsic intrusive igneous rock which is granular and phaneritic in texture. These rocks mainly consist of feldspar, quar... Read More

Capacity :
Granite: 20 Cu.mt/Day
Plant and Machinery cost:
695.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
23.00%
Break Even Point (BEP):
48.00 %
TCI :
1842.00 Lakhs
Cost of Project :
1842.00Lakhs
Add To Inquiry Basket
Shrimp Farming (E O U )
Shrimp Farming (E O U )

Shrimps are swimming, decapod crustaceans classified in the infra order Caridea, found widely around the world in both fresh and salt water. Shrimp... Read More

Capacity :
Shrimp: 1.4 MT/Day
Plant and Machinery cost:
895.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
12.00%
Break Even Point (BEP):
40.00 %
TCI :
3409.00 Lakhs
Cost of Project :
3409.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
A Business Plan For Sanit... Sanitary Napkins 4,800 PKTS per day 27.00 84.00
Start Manufacturing Of Bl... - 32.00 985.00
Start Production Of Potat... Potato Flakes 2 MT Per Day 25.00 563.00
Setup Manufacturing Unit ... Saddle 7,000 Unit Per Day Pedals 10,000 Unit Per Day 31.00 575.00
Opportunity in Sodium Sul... Sodium Sulfide Flakes 10,000 MT Per Annum 30.00 1426.00
Business Plan for Lithium... - 29.00 812.00
Start Manufacturing Busin... Cargo Containers (Size 20 Feet) 34 Nos Per Day 29.00 1992.00
Start Cutting and Grindin... Cutting Disc Size: (115 mm x 1 mm) 2,000 Pcs Pr Day Grinding Disc (115 mm x 6 mm) 2,000 Pcs Pr Day 28.00 423.00
Mink Blankets Production - 27.00 6000.00
A Business Plan for Micro... Micronutrient Fortified Energy Dense Food 100 MT Per Day 28.00 3500.00
Start Business of Caustic... - 25.00 56500.00
Start Crumb Rubber Powder... Crumb Rubber Powder 10 MT Per Day By Product Steel Wire 2 MT Per Day 26.00 303.00
Start Rice Milling Plant - 28.00 824.00
Start Manufacturing of Wo... Wooden Pencils 69,444 Gross Per Day 28.00 2400.00
A Business Plan for Monoc... Monocrystalline Silicon Ingots 400 Kgs Per Day 28.00 555.00
A Business Plan for Fiber... Fiberglass Tape 24,000 Mtrs. Per Day 28.00 442.00
Setup Plant of Compressed... - 28.00 950.00
Starting a Glass Bottles ... 300 MT Per Day 27.00 10600.00
Calcium Chloride Manufact... Calcium Chloride (Flakes): 1667 MT Per Day Carbon Di-oxide (By Product): 463 MT Per Day 26.00 101000.00
Cashew Nut Processing wit... White Cashew Nut: 200 Kgs Per Day Roasted Cashew Nut: 200 Kgs Per Day Fried Cashew Nut: 200 Kg 30.00 198.00
Cashew Nut Processing wit... White Cashew Nut: 200 Kgs Per Day Roasted Cashew Nut: 200 Kgs Per Day Fried Cashew Nut: 200 Kgs 29.00 200.00
Iodine Granules from Iodi... 200 MT Per Annum 31.00 600.00
Activated Carbon from Coc... 6 MT Per Day 29.00 720.00
Di-Calcium Phosphate: A P... Di-Calcium Phosphate (Powder): 25 MT Per Day Calcium Chloride (Flakes) by Product: 34 MT Per Day Hy 29.00 2800.00
Sanitary Napkins Manufact... Sanitary Napkins 8pcs in one pkt. (260 mm Size):  21,600 PKTS Per Day 31.00 305.00
Low Toxicity Base Oil fro... 100,000 Ltrs. Per Day 43.00 7200.00
Lab Grown Diamonds (CVD D... Lab Cultured Diamonds (1 Carat): 30 Carat Per Day 24.00 534.00
Start a Production Of Com... Compressed Bio Gas 6 MT Per Day Spent Slurry as Manure 60 MT Per Day 27.00 522.00
Start Industry Of Craft B... Craft Beer (Bottles 650 ml Size) 3,847 Bottles per day Craft Beer (Al. Cans 500 ml Size) 5,000 Bot 27.00 2007.00
Setup plant of Acetate T... Acetate Tow 8 MT Per Day 29.00 1426.00
12345678910...

Showing 601 - 660 of 2882 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.